Pharma Asia · 7–9 December 2027 · Karachi Expo Centre, Karachi Register to visit Book a stand
Visit Pharma Asia ↗
Investment & Opportunities

Highnoon breaks ground on Project FORCE, a greenfield plant built to FDA and EU standards

The listed manufacturer started work in January 2026 on a new facility at the Quaid-e-Azam Business Park special economic zone in Sheikhupura.

Highnoon breaks ground on Project FORCE, a greenfield plant built to FDA and EU standards
In this article
  1. What is being built
  2. Why it matters for the sector
  3. Opportunities for suppliers
  4. What “built to FDA and EU standards” involves
  5. Why a special economic zone
  6. What it means for suppliers and the industry
  7. Questions readers ask
  8. Meet the industry at Pharma Asia 2027
  9. Sources

Highnoon Laboratories Limited (PSX: HINOON) held the groundbreaking ceremony for Project FORCE, its greenfield manufacturing expansion, on 22 January 2026. The site is in the Special Economic Zone at the Quaid-e-Azam Business Park, Sheikhupura, according to the company’s stock filing.

What is being built

The company describes Project FORCE as a world-class, efficient and globally compliant pharmaceutical manufacturing facility. Dawn reported it as Pakistan’s first facility designed to comply with US FDA and EU requirements. The plant is meant to:

  • enlarge Highnoon’s manufacturing footprint and support future growth;
  • serve both domestic and international markets;
  • meet internationally recognised quality and regulatory standards.

Why it matters for the sector

Plants built to the standards of regulated markets are what Pakistan needs to export beyond its traditional destinations. The company is one of the more profitable listed manufacturers: it reported sales of Rs7.5 billion and profit after tax of Rs931 million in July–September 2026, with a gross margin of 57.1% (see Q1 FY27 results).

Opportunities for suppliers

A greenfield plant needs cleanrooms and HVAC, water systems, process and packaging machinery, laboratory equipment and validation services, which are the supplier groups that exhibit at Pharma Asia. Other projects are covered in Multinationals sell plants as local companies step up.

What “built to FDA and EU standards” involves

A plant designed for the strictest markets is planned around GMP from the first drawing. Production areas are laid out so that materials, people and waste move in one direction without crossing. Air handling, water systems and cleanrooms are designed for the products to be made. Equipment is chosen with qualification in mind, and computer systems must keep reliable, secure records. Every system is then qualified and every process validated before commercial production starts.

Building to these standards does not by itself give access to the US or European markets. Regulators in those markets must inspect and approve the site, and each product must be registered. That process takes years, and the plant must show that it can run consistently to the standard.

Why a special economic zone

Special economic zones offer developed land, utilities and incentives for investors. For a large greenfield project, a zone can shorten the time needed to start building and reduce some costs. Reliable power and water matter especially for pharmaceutical plants, which run air handling and water systems around the clock.

What it means for suppliers and the industry

  • Projects like this create demand for cleanroom construction, HVAC, water systems, process equipment, laboratory instruments and validation services.
  • They raise the bar for the local industry and train people in international practices.
  • They show how Pakistani companies are investing as multinationals sell plants. See Multinationals sell plants, local companies step up.

For the systems behind such a plant, read HVAC for non-sterile plants and Pharmaceutical water systems.

Questions readers ask

Where is the plant?
At the Quaid-e-Azam Business Park special economic zone in Sheikhupura.

When did work start?
Highnoon broke ground in January 2026.

Will it export to the US and Europe?
It is built to FDA and EU standards. Exports to those markets would need inspections and product approvals by their regulators.

Meet the industry at Pharma Asia 2027

The 25th Pharma Asia International Exhibition & Conferences runs from 7 to 9 December 2027 at the Karachi Expo Centre. Read Pharma Asia 2027: dates, rates and how to book or send an enquiry through the Book a stand page.

Sources